Sunday, December 16, 2012

APT MD ELECTRICAL PERMIT - NOT KOSHER!

NYC Buildings Work Permits bear this warning:
Tampering with or knowingly making a false entry in or falsely altering this permit is a crime that is punishable by a fine, imprisonment, or both.
In the last installment, it was revealed that one week after the owners were slapped with a SWO due to illegal work in apt. MD, they were at it again, literally at the same time, on at least 2 other units: 2D and 6D. No electrical permits were taken out when one was for apt. MD. Astounding!
On 12/12/2012, a complaint was filed for the illegal electrical work being done, absent a permit, in apartments 2D and 6D. Indicating that someone in  Rose Associates management is actually paying attention, the master electrician responsively filed permit applications  (12/13/2012). We noted, however, that he had filed one for 2B, instead of 2D. Responsively, on 12/14/2012, a "change" was e-Filed.
On viewing the new printable permit, it briefly appeared that the error was corrected:

Above: Corrected Electrical Permit for Apt. 2D
However, on review of the App # Z137735, additional problems were found.
First, while 2D was added, 2B is still on the permit application:

Original reads: Total Units: 24 units
The column marked "Apt." should have only one apartment unit per line. For two units, there should have been two lines. Further, we no longer know how many of the 24 fixtures and receptacles are for 2D, and how many are for 2B. 
The WORK DESCRIPTION shows only 1 new panel:

Since we know in fact that no work is planned for occupied 2B; and also know that a new panel was installed in 2D, we conclude that it is not honest for 2B to be listed on the permit. The Master Electrician had an ethical duty to fully correct the application, not just to change what the printable permit reads. Apartment 2B should no longer appear.
In fact, the honest response to the error of filing for the wrong apartment should have been to dump the one for 2B, and submit a new one for 2D. But that would have left it open for a no permit citation. Was it fudged? After all, who reads these things?
It gets worse.
After finding these problems, the whole application for Apt. 2B / 2D was reviewed. Note that these permits are "e-Filed", and we do not know if the Master Electrician actually went to the site and inspected the already completed job to which he e-Filed signed his name.
View from the Top - Apt. 2D
Electrical Application  #: Z137735
At the top it states that only unit 2D is applied for, while below it includes 2B. One must be wrong.
Note the original date - 12/13/2012 - and the date of "Last Change" - 12/14/2012. While he added 2D, he failed to remove 2B.
But the most troubling "error" of all was not noticed before.
NYC Buildings asks the applicant:
Was the work started or filed by others?
The licensed Master Electrician answered:
NO
This was most definitely a false statement. The work was virtually completed prior to his filing the application. The apartment's lights were left on over the weekend, as seen from the street on Friday, December 14, 2012. [- With garbage displayed in the window.]  
He should have responded:
YES

Is the Permit Application for Apartment MD "Legal"?
All of the above indicates that the permit application for MD should be revisited.
NYC Buildings asks the applicant:
Was the work started or filed by others?
The licensed Master Electrician answered:
NO
Now, with 2D / 2B, someone might attempt to argue that the work was not started by others.
But here, in MD, there was a stop Work Order, BECAUSE, specifically for the reason, that the electrical work had been started, by others, with no permit.
Should he not have responded thus? -->
YES
Meanwhile, the permit for 2D is not posted, not on the apartment door, nor on the building entry. After all, the work is done, one day after seeking the application. So who needs that darn permit anyhow?!
6D has it posted on the apartment door, but also not on the building.

Thursday, December 13, 2012

A [first] Lawful Electrical Permit. And then one for occupied 2B?!

Sorry for the delayed posting.
Hot off the NYC Buildings Press:
Lawful Electrical Permit for Apartment MD!
-Notice that this permit actually has the street address, and the complete identifier for the apartment in question:  "MD"
This appears to be the only such lawful apartment electrical permit from this building.
Literally.
Example:
Electrical Permit for Apartment 5G -
Where is the "G"??
What is with this "005"?!
The Fifth Floor is not sufficient.
Table: 21 Apartments subjected to Reconstruction with A2 Permits.
Others - at least 6 identified - without any permits.
Most have new or upgraded electric panels, requiring permits - but only a few might have been permitted.
- As of 12/6/2012, the only apartment at 110 Bennett Ave.,
with a correct & clearly marked electrical permit,
 was Apartment MD!
On 12/11/2012, tenants noticed that two recently vacated apartments were being worked on, with no permits, days after the SWO ECB Violation: 
Unit 2D
&
Unit 6D.
Complaint was made:
1339226110 BENNETT AVENUE12/12/20123AACT
NYC Department of Buildings
Overview for Complaint #:1339226 = ACTIVE
Complaint at:  110 BENNETT AVENUE BIN: 1064442 Borough:   MANHATTAN ZIP:   10033
Re:  ELECTRIC WORK IN PROGRESS IN 2 APTS. IN 2D... A NEW CIRCUIT BOX INSIDE AND ABOVE BOX WALL IS OPENED

Category Code:3A      UNLICENSED ELECTRICAL WORK IN PROGRESS
----------
It seemed that someone at Rose might have gotten THE MESSAGE to stop doing substandard and illegal work, because the very next day, 12/13/2012, an electrical permit application was made for apartment 6D:
But then it was noticed that they pulled a permit for apartment 2B, which is currently occupied.

Perhaps we should have a poll from the readers, seeking the reason for this phenomena:
___ A. The Master Electrician who filed it does not know his ABC's - & D!
___ B. They are trying to make up for not having pulled an electrical permit for 2B in March, 2009, when they replaced the electrical panel. Of course, that would mean they have to retroactively permit the other 20+ units with new panels and no electrical permit pulled.
___ C. They know they are in BIG TIME violation in Apartment 2D, and are hoping once again to do a bait and switch, by pulling a permit for a unit nearby.
Please vote, comment, or give other explanations for this oddity.
Meanwhile, since we seem to have Rose's attention, albeit alphabetically dysfunctional, a request must be made:
COULD YOU PLEASE TURN UP THE HOT WATER?
WE CAN'T EVEN WASH OUR DISHES HERE!!!
Thank you.

Thursday, December 6, 2012

The SWO - The Superintendent tears down his Scarlet Letter

  OUT, OUT, D-MN SPOT!!  
These are the much awaited photographs, in which our building superintendent plays a Shakespearean role.
Thursday, November 29, 2012 - A NYC Buildings Construction Inspector finally gets access to building and apartment MD.
He found found that there was electrical work in progress, which had required a NYC DOB Permit.
A Stop Work Order on the electrical work was posted on the door, along with a hearing notice.
STOP WORK ORDER
Picture 1
He had attempted to gain entry the day before, on Wednesday, November 28, 2012, but the building superintendent and workers refused to open the door, despite the fact that the workers were working inside.
It was posted for them to contact NYC Buildings to arrange for an inspection. [Picture 2]
Picture 2 
On Thursday, shortly after the DOB Inspector left 110 Bennett Ave., building Superintendent Alejo Ramos entered, stage right.
On seeing the Stop Work Order on the door, with its magnificent red letters; and despite it being illegal to do so, he immediately tried to take it off. He could not peel it off! Much to his dismay, it was solidly glued on! He tried to scratch it off with his fingernails, scratch, scratch, scratch, but that just ripped it!!
Determined to get rid of the Scarlet Letters, the Public Proclamation of his sins, the Sign of his open defiance of NYS and NYC laws, regulations and rules, and even common sense; he quickly went to his apartment, and returned with a tool. He diligently scraped and scraped. [Picture 3]
Picture 3
However, despite his efforts, the tell tale glue remained! [Pictures 4 & 5]
Picture 4
What was he going to do to completely hide the shameful SWO?? Were the telltale letters still on the wall? Could someone still read it?
Picture 5
Unlike the rear courtyard of the building, where his dogs defecate, and he never cleans up; unlike the trash closets, which reek like garbage and sport dead cockroaches, which bothers him not at all; but here, here, here he had to do something to get rid of the evidence. And so, he was left with no choice. He had to clean it all up, to pretend, to try and make others believe, as though the SWO never existed:
Picture 6
And in this, he did a d-mn good job, didst he not?!
Picture 7
Or did he?  

Wednesday, December 5, 2012

110 Bennett Ave. 5 + 7 = Flawed Management

5 Open Plumbing Jobs
7 OPEN ELECTRICAL APPLICATIONS AND VIOLATIONS
------
Why hasn't Mark Motley located these problems through audits, and corrected them?
- And no, don't make false certifications.
.........
NYC Department of Buildings
Job Overview

NB / ALT1 / ALT2 / ARA / LAA Jobs with Open Plumbing Work
This query lists:
All open ARAs / LAAs

Alt-2 jobs with open plumbing work types (PL, SP, SD) NB or Alt-1 jobs without the "Final Plumbing Signoff" required item Note: This query does NOT check for open worktypes on NB or Alt-1 jobs.
..........................................

Premises: 110 BENNETT AVENUE MANHATTANBIN: 1064442    Block: 2180    Lot: 199

FILE DATEJOB #DOC #JOB TYPEJOB STATUSSTATUS DATELIC #APPLICANT
1.05/11/200912002325001A2R PERMIT-ENTIRE06/12/20090032734 RACHEN
 APARTMENT RENOVATION AT APT 2E.REPLACE FLOOR AND WALL FINISHES. REPLACE EX
 Work on Floor(s): 002
2.05/11/200912002330301A2R PERMIT-ENTIRE06/12/20090032734 RACHEN
 APARTMENT RENOVATION AT APT 5A.REPLACE FLOOR AND WALL FINISHES. REPLACE EX
Work on Floor(s): 005
3.12/21/201112093154501A2P APPROVED12/21/20110032734 RACHEN
 APARTMENT RENOVATION AT APT 3H, REPLACE FLOOR AND WALL FINISHES. REPLACE
 Work on Floor(s): 003
4.09/06/201212136850901A2R PERMIT-ENTIRE10/26/20120033613 RAKIM
 RENOVATE EXISTING APARTMENTS AS PER PLANS FILED. REPLACE EXISTING BATHROOM
 Work on Floor(s): 005
5.12/24/200310230565801PRE LAA FILED12/24/2003MP 000164COHENN
 TO TEST EXISTING GAS LINE FROM METER IN BASEMENT TO APPLIANCE STOVE IN APT
 Work on Floor(s): 003
------
Comments on Open Plumbing Jobs:
No need to bother finalizing testing that gas line, nope.
No need for Workers' Compensation, either:
APARTMENT RENOVATION AT APT 3H, application 12/21/2011  - Why isn't this project, under Mark Motley's administration, not completed?
http://a810-bisweb.nyc.gov/bisweb/BScanItemsRequiredServlet?requestid=3&defaultdisplay=y&passjobnumber=120931545&passdocnumber=01&allbin=1064442
No Workers' Compensation for the job.
No license or affidavit for the contractor.
No Final Report.
No Final Cost Affidavit.
---------------------------
NYC Department of Buildings
B-SCAN List of Required Items

INSURANCE: WORKERS' COMPENSATION NPER12/21/2011________

HIC LICENSE OR AFFIDAVIT NPER12/21/2011________

FINAL NPER12/21/201112/21/2011________

COST AFFIDAVIT (FINAL): PW3 NSGN12/21/2011________

===========
7 Active Electrical Jobs + Violations
==============
Premises: 110 BENNETT AVENUE MANHATTANActive Job Count: 7
BIN: 1064442    Block: 2180    Lot: 199Display (All) (Inactive) (Minor Work)

CONTROL
NUMBER
ENTER DATESTATUS /
STATUS DATE
LAST INSPECTION 
1. Z13731910/25/2012I - AWAITING INSPECTION REQUEST 
  INSPECTION DATE:  
TYPE: A - APPLICATIONFEE: $50.75  

 
FIRM NAME:  E D ELECTRICAL INCFIRM #:  004115 
LICENSEE NAME:   TANG KWOK WAHLICENSEE #:  010902 
ADVISORY BOARD INFO? NO  
2. Z12963303/23/2011I - AWAITING INSPECTION REQUEST  
  INSPECTION DATE:  
TYPE: A - APPLICATIONFEE: $40.00  

 
FIRM NAME:  GRX EURO ELECTRIC CORPFIRM #:  003779 
LICENSEE NAME:   SANCHEZ ALBERTOLICENSEE #:  011701 
POWER AUTHORIZATION: I - ISSUED
ADVISORY BOARD INFO? NO
 
3. Z12207006/16/2009V - OBJECTION PENDING AT OWNER 06/16/2009  
  INSPECTION DATE: 06/08/2009 
TYPE: P - PICK-UPFEE: $0.00  

 
FIRM NAME:  UNKNOWNFIRM #:   
LICENSEE NAME:   UNKNOWN LICENSEE #:   
VIOLATION: V - IN VIOLATION
VIOLATION NOTICE: 1 - FIRST NOTICE
FOLLOW UP NOTICE: V - OWNER VIOLATION
ADVISORY BOARD INFO? NO
INSPECTION RESULTS
DISPOSITION: W - ISSUE OBJECTION TO OWNER
 
4. Z12161905/12/2009I - AWAITING INSPECTION REQUEST  
  INSPECTION DATE:  
TYPE: A - APPLICATIONFEE: $40.00  

 
FIRM NAME:  BOROWIDE ELECT'L CONTR'SFIRM #:  003867 
LICENSEE NAME:   PAPANTONIOU GREGORYLICENSEE #:  010285 
ADVISORY BOARD INFO? NO  
5. Z12148704/28/2009P - OBJECTN PENDING AT CONTRACTOR 09/17/2009  
  INSPECTION DATE: 09/10/2009 
TYPE: A - APPLICATIONFEE: $515.00  

 
FIRM NAME:  GRX EURO ELECTRIC CORPFIRM #:  003779 
LICENSEE NAME:   SANCHEZ ALBERTOLICENSEE #:  011701 
VIOLATION: V - IN VIOLATION
VIOLATION NOTICE: 1 - FIRST NOTICE
POWER AUTHORIZATION: I - ISSUED
ADVISORY BOARD INFO? NO
INSPECTION RESULTS
DISPOSITION: A - OBJCTN ISSD: JOB COMPLETE
ENERGY REC: G - NO COMMENT
 
6. Z11450610/16/2007I - AWAITING INSPECTION REQUEST 
  INSPECTION DATE:  
TYPE: A - APPLICATIONFEE: $41.00  

 
FIRM NAME:  BOROWIDE ELECT'L CONTR'SFIRM #:  003867 
LICENSEE NAME:   PAPANTONIOU GREGORYLICENSEE #:  010285 
ADVISORY BOARD INFO? NO  
7. Z04497902/06/1992I - AWAITING INSPECTION REQUEST 
INSPECTION DATE: 01/28/1992 
TYPE: P - PICK-UPFEE: $0.00  

 
FIRM NAME:  UNKNOWNFIRM #:   
LICENSEE NAME:   UNKNOWN LICENSEE #:   
VIOLATION: V - IN VIOLATION
FOLLOW UP NOTICE: V - OWNER VIOLATION
ADVISORY BOARD INFO? NO
INSPECTION RESULTS
DISPOSITION: W - ISSUE OBJECTION TO OWNER




Tuesday, December 4, 2012

The Aldyn, & AIRE: Rose Associates & Mark Motley's Elevator Violation Problem

Hypothesis: Rose Associates' poor elevator record with the New York Portfolio L is part of a systemic pattern of poor management of properties entrusted to them. Similar problems will be seen in other properties managed by Rose Associates.
Null Hypothesis: Most properties managed by Rose Associates will not have a pattern of significant elevator violations and other problems.
-----------
Data:
Two Rose Associates properties, currently being promoted for rental, were reviewed:
AIRE    One Bedroom (1)  $3,800
200 West 67th Street, New York, NY 10023
or 140 AMSTERDAM AVENUE MANHATTAN
Tax Block: 1158

Tax Lot: 129

200 WEST 67 STREETMANHATTAN   10023BIN#  1088576    

Looks Fancy, doesn't it?
Well, if you care about a safe elevator to get you up to the 42nd story, think again:

14 Active Elevator Violations!

1. V 111611E9027/407885 DOB VIOLATION - ACTIVE11/16/2011
2. V 111611E9027/407886 DOB VIOLATION - ACTIVE11/16/2011
3.  V 111611E9027/407887 DOB VIOLATION - ACTIVE11/16/2011

4. V 111611E9027/407888 DOB VIOLATION - ACTIVE11/16/2011
5. V 111611E9027/407889 DOB VIOLATION - ACTIVE11/16/2011
6. V 111611E9027/407890 DOB VIOLATION - ACTIVE11/16/2011
7. V 111611E9027/407891 DOB VIOLATION - ACTIVE11/16/2011
8. V 111611E9027/407892 DOB VIOLATION - ACTIVE11/16/2011
9. V 111611E9027/407893 DOB VIOLATION - ACTIVE11/16/2011
10. V 073012E9027/437967 DOB VIOLATION - ACTIVE07/30/2012
11. V 073012E9027/437968 DOB VIOLATION - ACTIVE07/30/2012
12. V 073012E9027/437969 DOB VIOLATION - ACTIVE07/30/2012
13. V 073012E9027/437970 DOB VIOLATION - ACTIVE07/30/2012

14. V 073012E9027/437971 DOB VIOLATION - ACTIVE07/30/2012

26 Noise and After Hours Work Complaints!

   A sampling:

Category Code:04      AFTER HOURS WORK - ILLEGAL

AFTER-HOURS CONSTRUCTION,630AM, WEEKDAYS
THE CALLER IS REPORTING WKND CONSTRUCTION AT THE SITE @ THEABOVE INTERSECTION. THE CALLER IS UNSURE IF THERE IS A PERMIT FOR WKND WORK. PLEASE INVESTIGATE, AS THIS IS THE 2ND WKND THEY'VE BEEN OUT - NO WORK ON SUNDAY AT CONST SITE CONST WORK ON SATURDAY AFTER HOURS
CALLER STS NEWLY CONSTRUCTION SITE STARTED WORK AT 7AM SUNDAY MORNING. CALLER STS VERY LOUD JACKHAMMERING, WITH POSSIBLE NO VARIANCE PERMIT, NON POSTED. IN PROGRESS, ACROSS FROM ABOVE ADDRESS
THE CALLER STATES, THERE IS CONSTRUCTION WORK BEING DONE ATTHE LOCATION PROVIDED. AS PER CALLER, THE HOISTING MACHINE IS CREATING A LOT OF NOISE AND IS DROPPING VERY ABRUPTLY. PLEASE INVESTIGATE
CALLER IS REPORTING CONSTRUCTION WORK ON WEEKENDS BEFORE 10:AM
ILLEGAL CONSTRUCTION WORK BEING PERFORMED 6:30 AM AND ALSO ON SATURDAYS WITHOUT ANY SPECIAL PERMITS
WORKING ON SATURDAYS BEFORE 10AM WITHOUT PERMITS
CALLER STATES THAT DIRECTLY BEHIND ADDRESS ABOVE THERE IS CONSTRUCTION WORK BEING DONE ON SATURDAY
CALLER STATES THAT CONSTRUCTION IS BEGINNING AS EARLY AS 6:30 AM FOR THE 2ND DAY IN A ROW
CLR STS THAT THE WORK AT THE CONSTRUCTION SITE IS STARTING BEFORE 7AM MON-FRI, DUPLICATE COMPLAIT AS PER CLR

------
Category Code:04      AFTER HOURS WORK - ILLEGAL
1. 1293421150 AMSTERDAM AVENUE11/22/20100411/26/2010I2RES
2. 1283024140 AMSTERDAM AVENUE06/05/20100407/17/2010I2RES
3. 1273920150 AMSTERDAM AVENUE01/16/20100401/24/2010I2RES
4. 1273119150 AMSTERDAM AVENUE01/05/20100401/06/2010I2RES
5. 1262637150 AMSTERDAM AVENUE08/07/20090408/08/2009I2RES
6. 1259696150 AMSTERDAM AVENUE07/01/20090407/03/2009I2RES
7. 1259483150 AMSTERDAM AVENUE06/29/20090407/03/2009I2RES
8. 1254744150 AMSTERDAM AVENUE04/25/20090405/04/2009I2RES
9. 1248968140 AMSTERDAM AVENUE02/15/20090402/15/2009I2RES
10. 1229283150 AMSTERDAM AVENUE06/28/20080408/24/2008I2RES
11. 1229127150 AMSTERDAM AVENUE06/27/20080406/27/2008H1RES
12. 1229061150 AMSTERDAM AVENUE06/26/20080406/27/2008I2RES
13. 1229006150 AMSTERDAM AVENUE06/26/20080406/27/2008H1RES
14. 1227024150 AMSTERDAM AVENUE06/07/20080406/08/2008I2RES
15. 1226360156 AMSTERDAM AVENUE06/01/20080406/03/2008I2RES
16. 1226355150 AMSTERDAM AVENUE06/01/20080406/04/2008I2RES
17. 1221331150 AMSTERDAM AVENUE04/09/20080404/16/2008I2RES
18. 1221264150 AMSTERDAM AVENUE04/09/20080404/13/2008I2RES
19. 1220080150 AMSTERDAM AVENUE03/27/20080403/31/2008I2RES
20. 1213976150 AMSTERDAM AVENUE01/21/20080401/21/2008I2RES
21. 1213697150 AMSTERDAM AVENUE01/17/20080402/02/2008I2RES
22. 1209092150 AMSTERDAM AVENUE11/10/20070412/02/2007I2RES
23. 1209088150 AMSTERDAM AVENUE11/10/20070412/02/2007I2RES
24. 1203650150 AMSTERDAM AVENUE09/11/20070409/20/2007I2RES
25. 1197619150 AMSTERDAM AVENUE06/30/20070408/12/2007I2RES
26. 1184200160 AMSTERDAM AVENUE01/21/20070402/11/2007I2RES
...........

...... Major problems with labor conditions and other dangerous practices:
Category Code:91      SITE CONDITIONS ENDANGERING WORKERS

Disposition:  02/04/2010 - V3 - STOP WORK ORDER VIOLATION SERVED FOR NON-COMPLIANT AFTER HOURS WORK
Comments:  NO DIESEL FUMES NOTED: DOB VIO ISSUED FOR WORK EXCEEDING SCOPE OF VARIANCE. 10 + WORKERS CLEANING AFTER 6PM
DOB Violation #:  020310CAH01CH


Re:  PIECE OF PLANK FELL HITTING A CONSTRUCTION WORKER ON HIS  BACK

Category Code:91      SITE CONDITIONS ENDANGERING WORKERS

Last Inspection:  10/12/2010 - - BY BADGE # 2364
Disposition:  10/13/2010 - A8 - ECB VIOLATION SERVED
Comments:  WORK NOT CONFORMING TO APPROVED SS PLAN. FAILURE TO SAFEGUAR D ALL PERSONS AND PROPERTY
ECB Violation #s:  34861065R

    34861064P .........................................................................
OK, well, this does not look good. The Null Hypothesis seems to be at a loss.
Let's try another Rose Associates Managed Property:

The Aldyn  One bedroom - Rent: $4,495

60 Riverside Boulevard, New York, NY 10069



NYC Buildings Information
Building Stories: Existing:    38

Dwelling Units: Existing:    284

Main BIN: 450 WEST 63 STREETMANHATTAN   10069BIN#  1087835    

60 RIVERSIDE BOULEVARDMANHATTAN   10069BIN#  1810074    
RIVERSIDE BOULEVARD60 - 60Tax Block: 1171
Tax Lot: 145

========  This one is amazing:
NO DESIGN DRAWINGS PROVIDED FOR CANTILEVERED WORK PLATFORM ON 13TH FL.

==== More Dangerous work practices: A 4 x 8 piece of Plywood, flying through the air, falling 20 stories:
05/21/2009     L1 PARTIAL STOP WORK ORDER       1766      05/21/2009 
  4X8 PLYWOOD FORMWORK SECTION BROKE LOOSE FROM TIE-BACK FELL FROM 20 TH TO 1ST BFL

59      ELECTRICAL WIRING - DEFECTIVE/EXPOSED, IN PROGRESS
WEST END AVE, & WESTSIDE HIGHWAY, CLR STS FROM THE HIGHER FLRS 29 OR 30 IS FALLING DEBRIE, PLYWOOD AND WET CONCRETE FROM THE HIGHER FLRS, NEW DEVELOPMENT. BLDG
==  More Noise Complaints from residents subjected to intolerable living conditions:
CUSTOMER STS THERE IS CONSTRUCTION STARTING AT 6AM MONDAY THROUGH FRIDAY, CUSTOMER STS THERE IS NO SPECIAL PERMIT TO PERMIT THEM TO WORK BEFORE 7AM, PLS INVST ASAP
=====

AND OF COURSE, 13 ACTIVE ELEVATOR VIOLATIONS!!

1. V 112511E9027/408478 DOB VIOLATION - ACTIVE11/25/2011
2. V 112511E9027/408479 DOB VIOLATION - ACTIVE11/25/2011

3. V 112511E9027/408480 DOB VIOLATION - ACTIVE11/25/2011
4. V 112511E9027/408481 DOB VIOLATION - ACTIVE11/25/2011
5.V 112511E9027/408482 DOB VIOLATION - ACTIVE11/25/2011
6. V 112511E9027/408484 DOB VIOLATION - ACTIVE11/25/2011
7. V 112511E9027/408485 DOB VIOLATION - ACTIVE11/25/2011
8. V 112511E9027/408697 DOB VIOLATION - ACTIVE11/25/2011
9. V 072012E9027/435875 DOB VIOLATION - ACTIVE07/20/2012
10. V 072012E9027/435876 DOB VIOLATION - ACTIVE07/20/2012
11. V 072012E9027/435877 DOB VIOLATION - ACTIVE07/20/2012
12. V 072012E9027/435878 DOB VIOLATION - ACTIVE07/20/2012

13. V 010112BENCH00467 DOB VIOLATION - ACTIVE01/01/2012

And look, its the same management team as at our building:
            Mark Motley!
OwnerLast Reg Dt
Reg Expire Dt
OrganizationLast NmFirst NmHouse NoStreet NmAptCityStateZip
Head Officer04/11/2012 04/01/2013  O'MEARANORTON875N. MICHIGAN AVE4 FLCHICAGOIL60611
Officer04/11/2012 04/01/2013  WINTERERBRITTON345PARK AVE25 FLNEW YORKNY10154
Corporation04/11/2012 04/01/2013 THE ALDYN C/O ROSE ASSOCIATES, INC  200MADISON AVENUE5TH FLNEW YORKNY10016
Managing Agent04/11/2012 04/01/2013 ROSE ASSOCIATES, INCMOTLEYMARK200MADISON AVENUE5TH FLNEW YORKNY10016
Emerg. Contact04/11/2012 04/01/2013  FERREREDWARD